Drafting Evaluation Criteria

During the project creation phase, the Project Initiator creates an Evaluation Grid that sets out different Rated Criteria Categories and their respective weightings and minimum thresholds: During the drafting phase, the assigned drafter will be responsible for filling in the descriptions under each Rated Criteria Category: Use the space provided under each Rated

2017-05-03T01:50:18+00:00Categories: Evaluation|

Evaluations in Context

The Evaluation Grid will be set up initially by the Project Initiator during the project set-up stage, on the page pictured below: A drafter will then be assigned to detail the rated criteria requirements under each of the categories established during the project set up stage. Please note that once the Evaluation Grid has

2017-05-03T01:50:52+00:00Categories: Evaluation|